Local News
US-176 Is Getting Wider: A $22.5 Million Grant for the Nexton-to-Jedburg Stretch
Jessica Cherie Blommaert · July 24, 2026

If your commute runs through the Nexton and Cane Bay area, you know the pinch on US-176. Some real relief is on the way. A federal BUILD grant of 22.5 million dollars was announced in mid-July to widen a key stretch of the highway.
Here is what the project includes:
- 2.7 miles widened from Nexton Parkway to Jedburg Road, going from two lanes to four.
- Improvements at seven intersections.
- A new bridge over Sandy Creek.
- The federal grant is matched by more than 34 million dollars in county funds through the One Cent Sales Tax.
The honest part: this is not an overnight fix. Construction is expected to begin around the third quarter of 2028. But funding secured is the hardest step, and this is a corridor that badly needs the capacity as Nexton, Cane Bay, and Jedburg keep growing.
Traffic is the number one concern I hear from families moving to this side of Summerville, so infrastructure like this genuinely matters when you are choosing where to buy. It is a sign the area is investing in keeping up with its own growth.
Curious how the road and growth picture affects a specific neighborhood you are considering? That is exactly the kind of local detail I dig into. Just call Jess.
Jessica Cherie Blommaert, REALTOR®, brokered by eXp Realty LLC, licensed in South Carolina. General information only; verify project timelines with Berkeley County and SCDOT.
